Archiv pro měsíc: Červenec 2022

ZVU Engineering a.s.

Production and complete assembly of technology – adiabatic nitration unit – 120 kt/year             ceska_republika
Realization: 2020-2021 (ZA2100156)
Destination: BorsodChem MCHZ s.r.o. Ostrava
  • PHOTO 3
  • PHOTO 1
  • IMG_4144
  • IMG_4140

Manufacture and Assembly of 20 apparatuses and exchangers, of which 5 columns

Material:  1.4404, 1.4539, P265GH
Lenght: Length up to 27 650 mm
Weight: Up to 22 365 kg/pc
  • IMG_20201204_112403
  • IMG_4053
  • 20201006_100921
  • 20201006_100813

INTECHA spol. s r.o.

Manufacture and assembly of 14 exchangers                ceska_republika
Realization: 2022 (ZA2000562)
Material: W.Nr. 1.4301, P265GH
Diameter: 273 – 826 mm
Lenght: 2 247 – 4 200 mm
Weight: 360 – 5 182 kg
  • 20220330_100612
  • 20220330_100259
  • 20220330_100421
  • 20220330_100411

ZVU Engineering, a.s.

MANUFACTURE AND ASSEMBLY – Condenser E4002                ceska_republika
Realization: 2021 (ZA2100173)
Material: TITAN Gr.2, P265GH, 1.4301
The technical requiremments: EN 13 445, 2014/68/PED
Diameter: 1 345 mm
Lenght: 7 620 mm
Weight: 4 375 kg
  • 20211108_064103
  • 20211108_064038
  • 20211022_104128
  • 20211022_104011