Welding control

  • control welding processes WPS – WPQR – WPS according to ČSN EN ISO 15 614
  • control technological methods of welding process to any orders in according to customer demand /ASME, EN ISO 3834-2, 2014/68/EU (PED)/
  • Welds control by Liquid Penetrant Testing (PT)
  • Control by Visual Testing (VT)

Another approve processes and NDT by contract.

  • EUROPEAN WELDING TECHNOLOGIST

    svarecsky-dozor 4
    Bc. David Stonawski

    Number:
    EWT/CZ 13030
    Valid from:
    29.5.2013
    Certifying Authority:

    Czech Welding Society ANB
  • INTERNATIONAL WELDING TECHNOLOGIST

    svarecsky-dozor 8
    Bc. David Stonawski

    Number:
    IWT/CZ 13030
    Valid from:
    29.5.2013
    Certifying Authority:

    Czech Welding Society ANB
  • EUROPEAN WELDING INSPECTOR

    svarecsky-dozor 5
    Ing. Pavel Sala

    Number:
    EWI-C/CZ 09002
    Valid from:
    5.10.2009
    Certifying Authority:

    Czech Welding Society ANB
  • EUROPEAN WELDING ENGINEER

    svarecsky-dozor 6
    Ing. Pavel Sala

    Number:
    EWE/CZ 09025
    Valid from:
    8.10.2009
    Certifying Authority:

    Czech Welding Society ANB
  • INTERNATIONAL WELDING ENGINEER

    svarecsky-dozor 2
    Ing. Pavel Sala

    Number:
    IWE/CZ 08052
    Valid from:
    22.12.2008
    Certifying Authority:

    Czech Welding Society ANB
  • INERNATIONAL WELDING INSPECTOR

    svarecsky-dozor 1
    Ing. Pavel Sala

    Number:
    IWI-C/CZ 09005
    Valid from:
    3.3.2009
    Certifying Authority:

    Czech Welding Society ANB